Case: “new production line”

New production line

STARTING SITUATION:

The required containers could not be purchased. So, it was decided to make these themselves. Condition: within 3 months, 400 complete sets (consisting of 5 containers) must be ready to deliver. There was nothing yet, except product drawings

CHOSEN APPROACH:

All known data was worked out pragmatically. Takt-time was specified. A first layout was set up with post-its, using the technical drawings. Then the details were worked out further, so the necessary space became

Continue reading “Case: “new production line””

Case: “optimise at the present or at a new location”

Optimise at the present or at a new location

STARTING SITUATION

The business manager was considering leaving the present building, with different spaces and roof heights, and depart to another property. Due to considerations of competition he also wanted to reduce the costs of Logistics.

CHOSEN APPROACH

The internal activities and material movements have been recorded in a 2-day scan. Using a Sankey-diagram, this could easily